Industrial implementation issues of Total Site Heat Integration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
34
0
4

Year Published

2013
2013
2018
2018

Publication Types

Select...
9
1

Relationship

1
9

Authors

Journals

citations
Cited by 85 publications
(41 citation statements)
references
References 19 publications
1
34
0
4
Order By: Relevance
“…Akbarnia et al [126] adapted pinch analysis methods for HENs to include piping costs in the targeting methodology. Chew et al [127] assembled a list of key issues which need to be considered when performing total site heat integration, which address design, operation and reliability issues. Moreover, these issues can become more complicated and of increasing difficulty to resolve when considering inter-plant transfers.…”
Section: Heat and Powermentioning
confidence: 99%
“…Akbarnia et al [126] adapted pinch analysis methods for HENs to include piping costs in the targeting methodology. Chew et al [127] assembled a list of key issues which need to be considered when performing total site heat integration, which address design, operation and reliability issues. Moreover, these issues can become more complicated and of increasing difficulty to resolve when considering inter-plant transfers.…”
Section: Heat and Powermentioning
confidence: 99%
“…Analysis of water network: The first step is to analyse the existing or the base case water network through plant auditing as shown in Figure 2. In general, water-using operations can be classified into two main categories, i.e., mass-transfer-based (MTB) and non-mass-transfer-based (NMTB) operations [1,14].…”
Section: Water Pinch Analysis Stepsmentioning
confidence: 99%
“…• Finally, the opportunities and obstacles when implementing Total Site Integration in practice have only become more comprehensively treated recently-see, e.g. Chew et al (2013).…”
Section: Major Issues With Total Site Integrationmentioning
confidence: 99%