2003
DOI: 10.4324/9780203223697
|View full text |Cite
|
Sign up to set email alerts
|

Industrialized and Automated Building Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
77
0
15

Year Published

2005
2005
2022
2022

Publication Types

Select...
4
3
2

Relationship

0
9

Authors

Journals

citations
Cited by 101 publications
(92 citation statements)
references
References 0 publications
0
77
0
15
Order By: Relevance
“…Although the adoption of the prefabrication still not strongly encouraged by the construction industry from the structured survey, there is a tendency for adopting modular prefabrication for the washroom in public housing and private residential building since it fulfill the key characteristics of prefabrication as discussed by Warszawski [20] like standardization, repetition, adopted in the design stage, mass production and client's requirement. The applications of the above suggested effective prefabrication model for the general projects, public housing, private residential and commercial projects in the construction, will also depend on the education and training for the frontline employees by enhancing their environmental awareness.…”
Section: Public Housing Private Residential and Commercial Projectsmentioning
confidence: 99%
“…Although the adoption of the prefabrication still not strongly encouraged by the construction industry from the structured survey, there is a tendency for adopting modular prefabrication for the washroom in public housing and private residential building since it fulfill the key characteristics of prefabrication as discussed by Warszawski [20] like standardization, repetition, adopted in the design stage, mass production and client's requirement. The applications of the above suggested effective prefabrication model for the general projects, public housing, private residential and commercial projects in the construction, will also depend on the education and training for the frontline employees by enhancing their environmental awareness.…”
Section: Public Housing Private Residential and Commercial Projectsmentioning
confidence: 99%
“…Tanto es así que algunos autores consideran la construcción como un proceso de ensamblaje de materiales y componentes (Gann, 1996;Gibb, 2001;Winch, 2003). La prefabricación en la edificación se ha multiplicado en las últimas décadas, sobre todo en los países más avanzados (Koskela, 1992;Gann, 1996;Warzawski, 1999;Gann, 2000;Monjó Carrió, 2005). Su mayor coste unitario inicial ha disminuido debido a la producción industrial en serie.…”
Section: Estado Del Arteunclassified
“…Su mayor coste unitario inicial ha disminuido debido a la producción industrial en serie. El diseño de las piezas lo controlan los proveedores de productos, que han buscado cierta normalización para incrementar la compatibilidad entre las piezas, siguiendo tendencias similares a las adoptadas previamente por otras industrias (Gann, 1996;Warzawski, 1999;Winch, 2003).…”
Section: Estado Del Arteunclassified
“…Transportation consideration will influence the design of precast components such as size and weight. Based on the study made by Warszawski [28], the length of a volumetric unit should not exceed 12 meter which is the normal vehicle length. The precast components' height, when loaded on the trailer, should not exceed a height limitation of highway ranging from 4.8 to 5.1 meter.…”
Section: Transportationmentioning
confidence: 99%