All Days 2016
DOI: 10.2118/181994-ms
|View full text |Cite
|
Sign up to set email alerts
|

Inflow Monitoring and Analysis Using Proprietary Intelligent Chemical Tracers in the Yuri Korchagina Field

Abstract: The first installation of intelligent tracers system in extended reach horizontal well was deployed by LUKOIL-Nizhnevolzhskneft LLC in a thin oil rim reservoir with a large gas cap located in the North region of the Caspian sea. Putting in operation of the Yu. Korchagin field is challenging serious tasks during development:relative zone inflow estimation;identifying intervals of water breakthrough;long-term monitoring of oil extraction and water level;monitoring of completion equipment functionality. … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2017
2017
2019
2019

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 7 publications
0
1
0
Order By: Relevance
“…Polymer rods were installed in channels bounded by ribs located between the outer diameter of the pipe and the inner diameter of the screen element (Figure 18). After the logging data during drilling was interpreted, a group of engineers from the development department identified places for installing swellable annular packers (16 intervals separated by packers), as well as eight intervals for installing intelligent tracers in the lower completion for this pilot well (Shtun, 2016).…”
Section: Figure 17-production Logging Using Intelligent Tracersmentioning
confidence: 99%
“…Polymer rods were installed in channels bounded by ribs located between the outer diameter of the pipe and the inner diameter of the screen element (Figure 18). After the logging data during drilling was interpreted, a group of engineers from the development department identified places for installing swellable annular packers (16 intervals separated by packers), as well as eight intervals for installing intelligent tracers in the lower completion for this pilot well (Shtun, 2016).…”
Section: Figure 17-production Logging Using Intelligent Tracersmentioning
confidence: 99%