During the station construction of gas and oil Pipelines, valves, instrument and flanges installation requires tapping in the main pipeline. It is hardly to identify visually the base pipe straight seam location of high frequency electric resistance welding. Some boss mounting positions are very close to electric welding pipe seam. Hence, it is very necessary to study the deep research and analysis for the boss installation influence on the base pipeline. The paper analyses the residual stress distribution on the high-frequency straight seam resistance welding pipeline by hole-drilling, and original residual stress impact about the different boss welding positions on high-frequency straight seam resistance welding pipe. There is a sharp rise in stress and the longitudinal weld residual stress impact after the boss installation on the electric resistance weld pipes is much larger than the mother pipeline.