2012 International Conference on Communication Systems and Network Technologies 2012
DOI: 10.1109/csnt.2012.63
|View full text |Cite
|
Sign up to set email alerts
|

Input Vector Comparison for Hourly Load Forecast of Small Load Area Using Artificial Neural Network

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2013
2013
2020
2020

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 14 publications
0
3
0
Order By: Relevance
“…However, the justification of the choices for the input vector is often absent [19]- [22], and the model architecture is often not systematically argued or commented in a clarified way [18], [23]- [26]. The input vector is often defined in an arbitrary way, mainly based on experience [24], [25] or reproduces sets of variables used in previous publications [23], [27], [20]. As to the number of neurons on the hidden layer, a common practice is to choose the structure that causes the lowest training error by a trial-and-error scheme [19], [21], [25], [28], [29].…”
Section: Introductionmentioning
confidence: 99%
“…However, the justification of the choices for the input vector is often absent [19]- [22], and the model architecture is often not systematically argued or commented in a clarified way [18], [23]- [26]. The input vector is often defined in an arbitrary way, mainly based on experience [24], [25] or reproduces sets of variables used in previous publications [23], [27], [20]. As to the number of neurons on the hidden layer, a common practice is to choose the structure that causes the lowest training error by a trial-and-error scheme [19], [21], [25], [28], [29].…”
Section: Introductionmentioning
confidence: 99%
“…Except predicting algorithm, the input selection of predicting methods cannot be ignored. Researchers always choose input variables by experience or simplified criterion . In order to obtain all the potential influence variables, considers amount of input variables, which contains load demand of several weeks ahead and climate parameters of several weeks ahead.…”
Section: Introductionmentioning
confidence: 99%
“…PSO is used to control parameters in BP. Finally, ANN uses to forecast load demand in hourly basis (Tasre et al, 2012).…”
Section: Load Demandmentioning
confidence: 99%