2022
DOI: 10.34031/2071-7318-2021-7-2-30-38
|View full text |Cite
|
Sign up to set email alerts
|

Inspection of Load-Bearing Structures of the Main Building of the Canning Factory

Abstract: Within technical re-equipment of the main building of canning plant there was a need of replacement of the capacitive equipment therefore load of overlapping of the first floor increased by 40.5 tons. In this regard, a comprehensive survey of structural structures was carried out. Defects and damages detected during the examination can in the future during operation lead to a decrease in the bearing capacity of the frame elements, and therefore to physical wear of the building. Therefore, taking into account t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 7 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?