2008
DOI: 10.1063/1.2908523
|View full text |Cite
|
Sign up to set email alerts
|

Installation and Commissioning of the Super Conducting Rf Linac Cryomodules for the Erlp

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2009
2009
2009
2009

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The cryogenic system [3] was installed during 2006 as a collaborative effort between Daresbury Laboratory, Linde, ACCEL and DeMaco, with both accelerating modules delivered in the first half of that year. Both modules were cooled to 2 K in December of 2006, and were tested with a simulated dynamic heat load of 112 W. Pressure stability of ± 0.03 mbar at 2 K and ± 0.10 mbar at 1.8 K has also been demonstrated, and the cryogenic system is now performing beyond its design specification.…”
Section: Cryogenic System and Accelerating Modulesmentioning
confidence: 99%
“…The cryogenic system [3] was installed during 2006 as a collaborative effort between Daresbury Laboratory, Linde, ACCEL and DeMaco, with both accelerating modules delivered in the first half of that year. Both modules were cooled to 2 K in December of 2006, and were tested with a simulated dynamic heat load of 112 W. Pressure stability of ± 0.03 mbar at 2 K and ± 0.10 mbar at 1.8 K has also been demonstrated, and the cryogenic system is now performing beyond its design specification.…”
Section: Cryogenic System and Accelerating Modulesmentioning
confidence: 99%