Installation of Fine-Grained Organic Dredged Materials in Combination With Geosynthetics in the German Dredgdikes Research Dike Facility

Abstract: In the project DredgDikes with partners from Poland and Germany different dredged materials from the South Baltic Sea region are investigated with respect to their application in dike construction. Two large-scale experimental dikes have been built, one in Germany and one in Poland. Additionally, an extensive laboratory testing programme has been realised and a considerable monitoring test programme will be followed. Based on a short general description of the project this paper covers the issue of installatio… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2014
2014
2021
2021

Publication Types

Select...
5

Relationship

2
3

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 12 publications
0
3
0
Order By: Relevance
“…3, the cross-section primarily saturates through the dike toe. This may even be a realistic scenario-the cover material M2 was installed in layers on top of the profiled sand core [22]. In the toe region, a possible machine-induced deformation of the core cross-section together with the exact profile of the dike surface may have caused local areas with reduced cover layer thickness.…”
Section: Unexpected Results In Variationmentioning
confidence: 99%
See 2 more Smart Citations
“…3, the cross-section primarily saturates through the dike toe. This may even be a realistic scenario-the cover material M2 was installed in layers on top of the profiled sand core [22]. In the toe region, a possible machine-induced deformation of the core cross-section together with the exact profile of the dike surface may have caused local areas with reduced cover layer thickness.…”
Section: Unexpected Results In Variationmentioning
confidence: 99%
“…This study focuses on one of the material combinations, namely cross-section D, consisting of a stable body made of a poorly graded sea sand "S" and a cover layer of approximately 1 m thickness, made of dredged material, "M2" (Figure 1). The cover layer was installed and compacted in layers of 0.30 m, using the caterpillar tracks for compaction perpendicular to the longitudinal axis [22]. A drainage pipe has been installed inside the sand core at the land-side toe to collect infiltrating water.…”
Section: Physical Model-the Rostock Research Dikementioning
confidence: 99%
See 1 more Smart Citation