All Days 1992
DOI: 10.4043/6956-ms
|View full text |Cite
|
Sign up to set email alerts
|

Installation of the South Pass 52 Platform

Abstract: Installation of the drilling and gas production platform for South Pass 52 required extensive planning and careful consideration of risks brought about by the tripod configuration, economic limitations on exploiting a marginal prospect, soft soils, and potentially significant currents. The jacket, 548 feet long and 2700 tons, relatively light for the water depth, was lifted from the barge at sea. Five foot deep skirts on the mud mats helped mobilize adequate bearing capacity and minimized mat size. Carefully s… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?