DOI: 10.4995/thesis/10251/63450
|View full text |Cite
|
Sign up to set email alerts
|

Integracion De Tecnicas Y Las Secuencias De Alarmas Para La Deteccion Y El Diagnostico De Fallos

Abstract: Valencia, Septiembre del 2015.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 16 publications
(21 reference statements)
0
4
0
Order By: Relevance
“…Figure 5 shows the configuration that is made in the GPRS of an alarm system; in this you must configure the APN provided by the communications company with their respective users and passwords, the receiver's IP, the receiver's port, the subscriber's number, telephone and life pulse; these last two items are provided by the central and are used in case the GSM network has failures, [52].…”
Section: Softwarementioning
confidence: 99%
“…Figure 5 shows the configuration that is made in the GPRS of an alarm system; in this you must configure the APN provided by the communications company with their respective users and passwords, the receiver's IP, the receiver's port, the subscriber's number, telephone and life pulse; these last two items are provided by the central and are used in case the GSM network has failures, [52].…”
Section: Softwarementioning
confidence: 99%
“…With regards to safety, the integrated management of the critical factors in the process ensures an optimum reliability level in the industrial plants [ 5 , 6 ]. Factors such as the control of the process variables, procedures, and steps followed in the transitional stages are intended to keep the plants within the operating established limits [ 7 , 8 ]. On the starting or shutdown procedures, the quantity of signals increases, so the plant’s safety needs to involve the integrated management of those factors when analyzing the causes of the accidents.…”
Section: Introductionmentioning
confidence: 99%
“…The use of digital data-based technologies in these systems suggests an increase in the amount of data that must be monitored and processed, including better communication ability among process agents [1]. Factors such as the control of process variables, procedures, and steps followed in transitional stages seek to keep the plants within the operating established "limits" [7] With regard to start up or shutdown procedures, the number of signals increases, the plant safety must have a comprehensive management of factors to analyze accident causes. In other words, these factors must be managed in a comprehensive, rather than separate manner, because if any of them is left outside, unattended or they decrease, this will be a safety threat [8]- [9].…”
Section: Introductionmentioning
confidence: 99%
“…Factors such as the control of process variables, procedures, and steps followed in transitional stages seek to keep the plants within the operating established "limits" [7] With regard to start up or shutdown procedures, the number of signals increases, the plant safety must have a comprehensive management of factors to analyze accident causes. In other words, these factors must be managed in a comprehensive, rather than separate manner, because if any of them is left outside, unattended or they decrease, this will be a safety threat [8]- [9]. When an industrial process changes its status, for example, start-up or shutdown, the alarm flood spreads, cuasing severe situations that prevent the operator's correct reaction.…”
Section: Introductionmentioning
confidence: 99%