2014
DOI: 10.22260/isarc2014/0014
|View full text |Cite
|
Sign up to set email alerts
|

Integrated Approach to Machine Guidance and OperationsMonitoring in Tunnel Construction

Abstract: -Tunnel construction method using a tunnel boring machine (TBM) is commonly adopted for building underground infrastructure, such as railways, roads, sewers, or utility pipelines.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0
2

Year Published

2017
2017
2022
2022

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(6 citation statements)
references
References 6 publications
0
4
0
2
Order By: Relevance
“…However the staged approach to assessment of engineering status of a tunnel not always allows to reveal hazardous processes in the considered geotechnical system and to realize effective protective measures at the appropriate times. It is essential not only to analyze separate operational stages of a tunnel, but also provide an information modeling of the lifespan of an object by creation of information model using BIM technologies [4][5][6][7][8][9][10]. At the present time, BIM technologies actively implement into many fields of industrial, civil and transport facilities design.…”
Section: Discussionmentioning
confidence: 99%
“…However the staged approach to assessment of engineering status of a tunnel not always allows to reveal hazardous processes in the considered geotechnical system and to realize effective protective measures at the appropriate times. It is essential not only to analyze separate operational stages of a tunnel, but also provide an information modeling of the lifespan of an object by creation of information model using BIM technologies [4][5][6][7][8][9][10]. At the present time, BIM technologies actively implement into many fields of industrial, civil and transport facilities design.…”
Section: Discussionmentioning
confidence: 99%
“…e radius of the new circular curve R n � R + ΔR and their difference is the new outer distance value E n . Since the offset does not change the deflection angle α of the horizontal curve, the inward displacement value P n of the new horizontal curve can be obtained from the outer distance in equation (6), where the transition curve length L Sn of the new horizontal curve can be obtained by equation (7), and the new curve angle β on can be obtained by equation (8). Afterward, the new tangent increment Q n can be obtained by equation ( 9), whereas the new tangent length T sn can be obtained by equation (10) and finally by equation (11), with the length of the curve being L n .…”
Section: When Dta Does Not Coincide With the Structurementioning
confidence: 99%
“…What is more, the GmBH VMT system even has a ring sequencing module to preset a projection of up to 10 rings [6]. However, as for the assembly simulation for an entire interval tunnel, there is no welldesigned program [7][8][9]. Besides, the majority of current research studies on precision focus on evaluating the erecting work quantification [10][11][12].…”
Section: Introductionmentioning
confidence: 99%
“…Исследования отечественных и зарубежных авторов в области геотехники посвящены не только совершенствованию методов возведения подземных сооружений, но и разработке технических решений по контролю и снижению негативного влияния подземного строительства на объекты городской инфраструктуры. В частности, в ряде работ рассматриваются методы мониторинга за деформациями грунтовых массивов и строительных конструкций в процессе подземного строительства [2,3]. Внимание уделено и вопросам обеспечения безопасности при освоении подземного пространства крупных мегаполисов [4][5][6][7][8][9].…”
Section: Introductionunclassified