All Days 2013
DOI: 10.2118/166852-ms
|View full text |Cite
|
Sign up to set email alerts
|

Integrated BHA Improves ROP by 62% in ERD Operation Saving 29 Days Rig-Time, Sets Russian Lateral Length Record

Abstract: Applying the integrated BHA solution and best practices on well P-116 drilled the lateral hole section at 55m/hr, a 62% increase compared to the best offset ROP of 34m/hr, setting a new 24-hr project drilling record of 691m/day. The reliable 6¾in RSS operated flawlessly for 154 hrs exceeding operator expectations. The 8½-in 716 PDC bit displayed good directional control and came out of the hole in acceptable dull condition. The use of oil-based mud successfully stabilized the problematic reactive shale formati… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2014
2014
2016
2016

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…In previous operations, the transient dynamic modeling with the detailed bit model has been utilized by the service company to identify drilling problems and to quantify the changes in BHA configuration and optimize the drilling parameters, prior to commencing drilling operation [1][2][3][4][5][6][7][8][9] . It has the proven capability to help operators improve drilling efficiency and log data quality.…”
Section: Introductionmentioning
confidence: 99%
“…In previous operations, the transient dynamic modeling with the detailed bit model has been utilized by the service company to identify drilling problems and to quantify the changes in BHA configuration and optimize the drilling parameters, prior to commencing drilling operation [1][2][3][4][5][6][7][8][9] . It has the proven capability to help operators improve drilling efficiency and log data quality.…”
Section: Introductionmentioning
confidence: 99%