2022
DOI: 10.1155/2022/1392831
|View full text |Cite|
|
Sign up to set email alerts
|

Integrated Design Technology of Geological Engineering for Pressure Flooding and Water Injection in Low Permeability Reservoirs: Take the Reservoir of Keshang Formation in Wu2 East Area as an Example

et al.

Abstract: The objective factors of low permeability reservoir determine that there is obvious starting pressure gradient in waterflooding development, and the injection pressure is high. Conventional waterflooding has the technical bottleneck of “no injection and no flooding.” It highlights the development contradictions such as serious under-injection, rapid production decline and difficult production of reserves. Pressurized water injection is a new technology of unconventional water injection to enhance oil recovery,… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 17 publications
0
1
0
Order By: Relevance
“…Tis article has been retracted by Hindawi, as publisher, following an investigation undertaken by the publisher [1]. Tis investigation has uncovered evidence of systematic manipulation of the publication and peer-review process.…”
mentioning
confidence: 99%
“…Tis article has been retracted by Hindawi, as publisher, following an investigation undertaken by the publisher [1]. Tis investigation has uncovered evidence of systematic manipulation of the publication and peer-review process.…”
mentioning
confidence: 99%