2019
DOI: 10.1016/j.energy.2019.07.145
|View full text |Cite
|
Sign up to set email alerts
|

Integrated energy management system employing pre-emptive priority based load scheduling (PEPLS) approach at residential premises

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
13
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 22 publications
(13 citation statements)
references
References 32 publications
0
13
0
Order By: Relevance
“…In contrast, loads with low priority are restricted. Another pre-emptive preference-based approach was developed to investigate appliance scheduling [84] . In this approach, equipment was segregated into three categories; shift-able, non-shift-able (NS), and interruptible non-shift-able equipment.…”
Section: Appliance Scheduling Based Energy Management Schemes For a S...mentioning
confidence: 99%
“…In contrast, loads with low priority are restricted. Another pre-emptive preference-based approach was developed to investigate appliance scheduling [84] . In this approach, equipment was segregated into three categories; shift-able, non-shift-able (NS), and interruptible non-shift-able equipment.…”
Section: Appliance Scheduling Based Energy Management Schemes For a S...mentioning
confidence: 99%
“…In AS-REMS, power consumption of an appliance a ∈ L at a ts t ∈ T of a day d ∈ D is defined in Equation (2).…”
Section: Appliancesmentioning
confidence: 99%
“…Some REM studies in the literature dealt with cost reduction and keeping user comfort simultaneously. Through these studies, the work in [ 2 ] proposed a pre-emptive priority-based load scheduling approach at residential premises, while a REM algorithm using reinforcement learning and an artificial neural network was presented in [ 3 ]. The work in [ 4 ] demonstrated that comfort and energy consumption can be partially decoupled by an adaptive indoor comfort management approach.…”
Section: Introductionmentioning
confidence: 99%
“…However, in such cases, the energy consumption may exceed the limit, or they do not consider the preference of appliances. Recently, several schemes presented with concepts of incorporating the appliances' priorities [28,29]. However, assigning appliances priorities and load scheduling is a complex job due to the stochastic behavior of humans.…”
Section: Smart Home Appliances Scheduling: a Single User Scenariomentioning
confidence: 99%