2017
DOI: 10.1016/j.ijproman.2017.02.016
|View full text |Cite
|
Sign up to set email alerts
|

Integrated management of on-site, coordination and off-site uncertainty: Theorizing risk analysis within a hybrid project setting

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
28
0
3

Year Published

2018
2018
2023
2023

Publication Types

Select...
5
3
1

Relationship

1
8

Authors

Journals

citations
Cited by 78 publications
(39 citation statements)
references
References 61 publications
1
28
0
3
Order By: Relevance
“…(4) Risk management objective, engineering type and engineering harmony The hypothesis 7 and hypothesis 8 are verified in this study, that is, risk management objective has a positive impact on the realization of engineering harmony, and the engineering type has a regulatory effect on the engineering harmony to the positive effect of risk management objective. The conclusion is in line with the views of scholars such as M. Arashpour, Abbasi, M. Arashpour, Hosseini, and Yang (2017), Hwang and Ng (2016), Xia, Zou, Griffin, Wang, and Zhong (2018). The contradiction between risk management objective and stakeholders' demands is particularly prominent in the construction project, and the failure of the project is also common (Mok, Shen, & Yang, 2015).…”
Section: Research Conclusion and Management Implicationssupporting
confidence: 83%
See 1 more Smart Citation
“…(4) Risk management objective, engineering type and engineering harmony The hypothesis 7 and hypothesis 8 are verified in this study, that is, risk management objective has a positive impact on the realization of engineering harmony, and the engineering type has a regulatory effect on the engineering harmony to the positive effect of risk management objective. The conclusion is in line with the views of scholars such as M. Arashpour, Abbasi, M. Arashpour, Hosseini, and Yang (2017), Hwang and Ng (2016), Xia, Zou, Griffin, Wang, and Zhong (2018). The contradiction between risk management objective and stakeholders' demands is particularly prominent in the construction project, and the failure of the project is also common (Mok, Shen, & Yang, 2015).…”
Section: Research Conclusion and Management Implicationssupporting
confidence: 83%
“…Targeted risk control should be conducted according to engineering types. The purpose of risk management is to increase the possibility and impact of positive events and reduce negative events in the engineering (Arashpour et al, 2017). The realization of engineering harmony not only requires a reasonable and efficient risk management model, but also needs to analyze the relationship network of stakeholders deeply.…”
Section: Research Conclusion and Management Implicationsmentioning
confidence: 99%
“…In order to provide such housing, the Korean government has been promoting small-size and small-scale Public Rental Housing provision policies in the last few decades. It remains difficult to solve current problems stemming from rapidly increasing demand for small-scale public rental housing using current construction methods, such as site-based construction, which are limited by extended construction times, due to wet construction methods, and increased construction costs, due to project risks, such as lack of worker and weather conditions [28][29][30].…”
Section: Characteristics Of Public Rental Housing In Koreamentioning
confidence: 99%
“…Temporary structures and works such as hoardings and scaffolding support construction of projects [51,52]. Decision making on temporary structures and works requires consideration of both temporal and spatial limitations [53,54]. Traditionally the decision making has been based on experience of design and construction teams, often causing delays and time-space conflicts [55,56].…”
Section: Efficient Planning Of Temporary Work and Structuresmentioning
confidence: 99%