Integrated Planning and Scheduling for NASA’s Deep Space Network – from Forecasting to Real-time

Abstract: Over a period of several years, the software systems that plan and schedule the use of NASA's Deep Space Network (DSN) for the projects it serves have been upgraded from a disparate set of decades-old software components, to an integrated suite covering long-range planning and forecasting, all the way to real-time scheduling. The most recent component of this suite is known as LAPS, for Loading Analysis and Planning Software, and is responsible for long-term planning and forecasting, including studies and anal… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 6 publications
(3 citation statements)
references
References 5 publications
0
3
0
Order By: Relevance
“…Then, schedules are improved through an iterative process involving peer-to-peer negotiation between teams. The DSN scheduling process consists a three phases [1], [2], [4], [5]. The Long Range Planning and Forecasting period typically starts four to six months before execution.…”
Section: A Dsn Schedulingmentioning
confidence: 99%
See 1 more Smart Citation
“…Then, schedules are improved through an iterative process involving peer-to-peer negotiation between teams. The DSN scheduling process consists a three phases [1], [2], [4], [5]. The Long Range Planning and Forecasting period typically starts four to six months before execution.…”
Section: A Dsn Schedulingmentioning
confidence: 99%
“…This expansion uses M + 1 binary variables instead of N with M = ⌊log 2 N ⌋, drastically reducing the number of y variables needed. In order to satisfy the user satisfaction metric (7), we implemented the QUBO terms ( 8) and ( 9) using this binary expansion and added those two terms to the total cost function (4). We detail the transformation of DSN information into binary variables y with the pseudo code of Algorithm (2).…”
Section: Extended Qubo Formulation a User Satisfactionmentioning
confidence: 99%
“…LCM also provides users with information about scheduled asset downtimes and critical mission events to give context to the schedule. This data is synchronized from a RESTful API web service provided by a separate tool, the Loading Analysis and Planning Software (LAPS) managed out of JPL and used for long range planning [5]. Downtimes are also used in LCM to define intervals for scheduling specific maintenance and engineering activities -another key feature of LCM.…”
Section: Rangingmentioning
confidence: 99%