2022
DOI: 10.1186/s10033-022-00683-7
|View full text |Cite
|
Sign up to set email alerts
|

Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop

Abstract: The connection between production scheduling and transportation scheduling is getting closer in smart manufacturing system, and both of those problems are summarized as NP-hard problems. However, only a few studies have considered them simultaneously. This paper solves the integrated production and transportation scheduling problem (IPTSP) in hybrid flow shops, which is an extension of the hybrid flow shop scheduling problem (HFSP). In addition to the production scheduling on machines, the transportation sched… Show more

Help me understand this report
View preprint versions

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
9
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
3

Relationship

1
7

Authors

Journals

citations
Cited by 33 publications
(9 citation statements)
references
References 28 publications
0
9
0
Order By: Relevance
“…Yao [ 9 ] proposed an intelligent AGV management system that maximizes accurate delivery performance and minimizes AGV energy consumption under disturbance by establishing a mixed integer nonlinear programming model supported by IoT production data. Li [ 10 ] proposed a genetic tabu search algorithm to solve the minimum maximum completion time of integrated scheduling of production and transportation, and proved its effectiveness through the results. Yan [ 11 ] analyzed the coupling relationship between the transportation and the processing stage and established the scheduling model under the limited transportation conditions given the constraints of the limited transportation.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Yao [ 9 ] proposed an intelligent AGV management system that maximizes accurate delivery performance and minimizes AGV energy consumption under disturbance by establishing a mixed integer nonlinear programming model supported by IoT production data. Li [ 10 ] proposed a genetic tabu search algorithm to solve the minimum maximum completion time of integrated scheduling of production and transportation, and proved its effectiveness through the results. Yan [ 11 ] analyzed the coupling relationship between the transportation and the processing stage and established the scheduling model under the limited transportation conditions given the constraints of the limited transportation.…”
Section: Literature Reviewmentioning
confidence: 99%
“…More efforts have been made in applying heuristic and metaheuristic algorithms to solve HFSP. The combination and improvement of algorithms to address the search capability and search speed of the algorithm is an effective way to solve the HFSP [33]. However, there is still a shortage of research in the application area of knitting shops, and the efforts of related scholars are still required.…”
Section: Related Workmentioning
confidence: 99%
“…, , T T T .Then the evolution process can be seen in Figure 8. The indices of points (1, 2), (3,4), (10,11) in the sequence are respectively recorded as 1 2 3…”
Section: Local Evolutionary Algorithm In Z3mentioning
confidence: 99%
“…Take out the element pointed to by the iterator itRS7, that is (T 1 , T 2 , T 3 ).Then the evolution process can be seen in Figure 8. The indices of points (1, 2), (3,4), (10,11) in the sequence are respectively recorded as T 1 , T 2 , T 3 . In Figure 6, (T…”
Section: T T T < mentioning
confidence: 99%
See 1 more Smart Citation