2018
DOI: 10.1080/00207543.2018.1530472
|View full text |Cite
|
Sign up to set email alerts
|

Integrated production, statistical process control, and maintenance policy for unreliable manufacturing systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
14
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
9
1

Relationship

1
9

Authors

Journals

citations
Cited by 39 publications
(16 citation statements)
references
References 39 publications
0
14
0
Order By: Relevance
“…They also studied three types of incidents under machine failure situations: emergency replenishment, revenue-sharing contract, and price discount contract. Besides, Pal et al [17], Shi [21], Taleizadeh et al [22], Cheng et al [5], Bahria et al [1], etc. studied different models in this direction.…”
Section: Literature Surveymentioning
confidence: 99%
“…They also studied three types of incidents under machine failure situations: emergency replenishment, revenue-sharing contract, and price discount contract. Besides, Pal et al [17], Shi [21], Taleizadeh et al [22], Cheng et al [5], Bahria et al [1], etc. studied different models in this direction.…”
Section: Literature Surveymentioning
confidence: 99%
“…Reference [16] investigated the effects of non-normally distributed data on the economic design ofX control charts for production systems under imperfect maintenance. Reference [17] developed an integrated approach for maintenance andX control chart for batch manufacturing systems.…”
Section: Literature Review Notationsmentioning
confidence: 99%
“…The decision variables considered are the production lot size, the safety stock, the sampling plan and overhaul scheduling with an outgoing quality constraint. Bahria et al (2019) extended the work of Bahria et al (2018) by integrating the buffer stock with the control chart and PM and CM both based on quality control results. Salmasnia et al (2019) proposed an integrated model for joint determination of production run length, adaptive control chart parameters and the maintenance policy.…”
Section: Control Chart Production and Maintenancementioning
confidence: 99%