Integrated Scheduling of Rail-Mounted Gantry Cranes, Internal Trucks and Reach Stackers in Railway Operation Area of Container Terminal

Abstract: In this paper, the integrated scheduling of handling equipment at the railway handling area in container terminals is studied, where rail-mounted gantry cranes, internal trucks, and reach stackers are deployed. In the course of the handling operation, loading and unloading containers are handled simultaneously. The handling process is first studied and some scheduling schemes are put forward. Based on the analysis, the problem is formulated as a mixed-integer programming model, with the objectives of minimizin… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
6
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 16 publications
(6 citation statements)
references
References 28 publications
0
6
0
Order By: Relevance
“…A two-tier planning model with the objective of minimizing the completion time was established by considering AGV path planning, and a two-tier genetic algorithm (GA) based on congestion prevention rules was proposed to solve the model. Yan et al studied the integrated scheduling problem for rail-mounted gantry cranes, internal trucks, and reach stackers (7) an integrated scheduling optimization model for AGVs and ASCs with the goal of reducing the overall energy consumption by considering both equipment operating process and quantity matching (13). For the YC and YT scheduling problems in container terminals, Hsu et al studied four potential hybrid scheduling systems, each with its own heuristic algorithm (14).…”
Section: Literature Reviewmentioning
confidence: 99%
See 3 more Smart Citations
“…A two-tier planning model with the objective of minimizing the completion time was established by considering AGV path planning, and a two-tier genetic algorithm (GA) based on congestion prevention rules was proposed to solve the model. Yan et al studied the integrated scheduling problem for rail-mounted gantry cranes, internal trucks, and reach stackers (7) an integrated scheduling optimization model for AGVs and ASCs with the goal of reducing the overall energy consumption by considering both equipment operating process and quantity matching (13). For the YC and YT scheduling problems in container terminals, Hsu et al studied four potential hybrid scheduling systems, each with its own heuristic algorithm (14).…”
Section: Literature Reviewmentioning
confidence: 99%
“…A two-tier planning model with the objective of minimizing the completion time was established by considering AGV path planning, and a two-tier genetic algorithm (GA) based on congestion prevention rules was proposed to solve the model. Yan et al studied the integrated scheduling problem for rail-mounted gantry cranes, internal trucks, and reach stackers ( 7 ). An optimization model with the objective of minimizing the completion time and total waiting time of all equipment was developed by considering the simultaneous loading and unloading process of containers.…”
Section: Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…A hybrid heuristic algorithm was used for solving. Yan et al 3 addressed the optimization of coordinated scheduling for multiple equipment types, including RMGCs, container trucks, and reach stackers, within the railway operation area of a port. They established a mixed-integer linear programming problem with the objectives of minimizing equipment completion times and waiting times, under the condition of fixed work zones for RMGCs.…”
Section: Introductionmentioning
confidence: 99%