Integrating Geotechnical Engineering and Finite Element Analysis in Urban Tunnel Construction: Case Study of Zhongshan Road Station on Hohhot Metro Line 2
Kuan Wang
Abstract:The expansion of Metro Line 2 with the addition of Zhongshan Road Station in Hohhot presents a paradigm of urban engineering that merges infrastructure growth with the conservation of extant utility systems. This study examines the station's construction, located at a critical junction, which includes a novel straight-wall arch tunnel in close proximity to essential gas pipelines. The core of this paper explores the geotechnical challenges, the application of advanced construction techniques, and particularly … Show more
Set email alert for when this publication receives citations?
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.