1991
DOI: 10.1016/0166-3615(91)90033-6
|View full text |Cite
|
Sign up to set email alerts
|

Integration of a CIM tool management system to an intelligent feature-based process planning system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
5
0

Year Published

1994
1994
2010
2010

Publication Types

Select...
5
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 10 publications
(5 citation statements)
references
References 1 publication
0
5
0
Order By: Relevance
“…For example, a production planner (possibly a computer[ 6]) must know what tools can be used, how many useful tools exist and their whereabouts, otherwise a production plan cannot be scheduled properly. Production planning and process control systems must be updated or changed in real time according to the real situation, otherwise the operation of the system can be disrupted.…”
Section: A Tool Database In Fmsmentioning
confidence: 99%
“…For example, a production planner (possibly a computer[ 6]) must know what tools can be used, how many useful tools exist and their whereabouts, otherwise a production plan cannot be scheduled properly. Production planning and process control systems must be updated or changed in real time according to the real situation, otherwise the operation of the system can be disrupted.…”
Section: A Tool Database In Fmsmentioning
confidence: 99%
“…Today's production environment is moving toward customization and wide variety, which has caused a growth in FMS or CIM tooling (Torvinen et al, 1991). The number of tools in a medium size manufacturing system can easily exceed one thousand.…”
Section: Introductionmentioning
confidence: 99%
“…However, how to design a tool database system is still a challenging issue (Shayan and Liu, 1995;Backes et al, 1998). Most of the work in developing a tool database system presents the simulation processes and implementation results (Torvinen et al, 1991;Chan, 1992). From an optimization viewpoint, Akturk and Onen (2002) point out that tool management and lot sizing cannot be viewed in isolation.…”
Section: Introductionmentioning
confidence: 99%
“…Production planning and process control systems must be updated or changed in real time, otherwise the operation of the system can be disrupted. Part programmers must know the actual sizes of tlte tools and their characteristics and behavior in different conditions, otlterwise part programs cannot be generated properly, causing lower quality and productivity (Torvinen and Salminen, 1991).…”
Section: Tool Databasementioning
confidence: 99%