Integration of Building Information Modeling (BIM) and Virtual Design and Construction (VDC) with Stick-Built Construction to Implement Digital Construction: A Canadian General Contractor’s Perspective

Abstract: Building information modeling (BIM) and virtual design and construction (VDC) are useful management processes and methodologies to enhance project communication and coordination. Over the past few decades, researchers and practitioners have made efforts to promote the adoption of BIM and VDC in the construction industry. However, currently, the promotion and adoption of BIM and VDC are relatively slow in North America. This paper focuses on developing an approach to drive the adoption of the technologies throu… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(2 citation statements)
references
References 25 publications
0
2
0
Order By: Relevance
“…To increase uptake, the industry needs to enhance its competitiveness, improve the design process, and shorten the development cycle [31]. Government policy should also include up-to-date industry courses and requirements along with job opportunities to enhance practical training [32]. In a previous study, the procurement method was a significant barrier to the adoption of off-site construction.…”
Section: How To Increase Prefabricationmentioning
confidence: 99%
“…To increase uptake, the industry needs to enhance its competitiveness, improve the design process, and shorten the development cycle [31]. Government policy should also include up-to-date industry courses and requirements along with job opportunities to enhance practical training [32]. In a previous study, the procurement method was a significant barrier to the adoption of off-site construction.…”
Section: How To Increase Prefabricationmentioning
confidence: 99%
“…(Changali et al, 2015). The fragmented works also generate significant problems (Saka et al, 2020), such as repetitive work, waste of resources and workforce, increased costs, and delay in project progress (Adel et al, 2022). When facing complex projects, it is challenging to reach integrated management: the sequence of tasks in construction involves space, resources, time, procurement, dimension constraints, and other issues in the project process (Allen et al, 1983).…”
Section: Introductionmentioning
confidence: 99%