2020
DOI: 10.18690/actageotechslov.17.1.33-45.2020
|View full text |Cite
|
Sign up to set email alerts
|

Integration of measurement techniques in monitoring of the Laze landslide in Slovenia

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

2
5
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(7 citation statements)
references
References 0 publications
2
5
0
Order By: Relevance
“…Usually, the movements occur after heavy rainfall. The largest movement took place in January 2014, and after that, various activities and investigations started [38].…”
Section: Laze Landslidementioning
confidence: 99%
See 4 more Smart Citations
“…Usually, the movements occur after heavy rainfall. The largest movement took place in January 2014, and after that, various activities and investigations started [38].…”
Section: Laze Landslidementioning
confidence: 99%
“…Usually, the movements occur after heavy rainfall. The largest movement took place in January 2014, and after that, various activities and investigations started [38]. Initially, monitoring was conducted only by visual inspections, then some boreholes were drilled in 2014 to determine the landslide depths, and later larger boreholes were installed in 2015 with equipment to pump out the water and measure the groundwater level.…”
Section: Laze Landslidementioning
confidence: 99%
See 3 more Smart Citations