Intelligent Completions: Lessons Learned from 7 Years of Installation and Operational Experience

Abstract: TX 75083-3836, U.S.A., fax 01-972-952-9435. AbstractSince the first intelligent completion was installed in August 1997, over 200 such systems have been installed globally. The systems installed encompass a wide range of downhole and surface equipment, though some aspects are similar for all installations. This paper will address the lessons learned and best practices developed since the installation of the first system seven years ago.Detailed project and operational planning is critical to the success of any… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
3
0

Year Published

2006
2006
2008
2008

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 11 publications
(3 citation statements)
references
References 9 publications
0
3
0
Order By: Relevance
“…Detailed project and operational planning is critical to successful intelligent completion installations 3 . Several workshops and operation evaluations involving the suppliers and Aramco representatives were conducted to improve communications and identify the roles and responsibilities.…”
Section: Smart Well Completion Planning and Equipment Testingmentioning
confidence: 99%
“…Detailed project and operational planning is critical to successful intelligent completion installations 3 . Several workshops and operation evaluations involving the suppliers and Aramco representatives were conducted to improve communications and identify the roles and responsibilities.…”
Section: Smart Well Completion Planning and Equipment Testingmentioning
confidence: 99%
“…Application of smart well technology has been growing in the Industry with an increasing number of applications in maturing fields and carbonate reservoirs 6,7,8 .…”
Section: Retrofit Wells With Smart Well Technologymentioning
confidence: 99%
“…These valves are activated from surface by applying hydraulic pressure ("direct hydraulic") transmitted via control lines (C/L) penetrating tubing hanger and packer. For three valves four C/Ls are needed (one to control each valve individually, one shared return line) 19,20 .…”
mentioning
confidence: 99%