2015
DOI: 10.1007/978-3-319-17906-3_23
|View full text |Cite
|
Sign up to set email alerts
|

Intelligent Systems in Project Performance Measurement and Evaluation

Abstract: Over the life cycle of a project, project costs and time estimations play important roles in baseline scheduling, schedule risk analysis and project control. Performance measurement is the ongoing, regular collection of information that can provide this controlling system. In this study, firstly, a new simulation approach is proposed to develop project progress time-series data, based on the complexity and specifications of the project as well as on the environment in which the project is executed. This simula… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 7 publications
(8 citation statements)
references
References 33 publications
0
8
0
Order By: Relevance
“…PMIS needs to handle that kind of situation. Establish well-defined automated processes between high management levels of the organization and the PMIS internal settings, promising new relationship features in the way on which these two entities communicate between them [138].…”
Section: Concerns On Recommend Practitioners Needmentioning
confidence: 99%
“…PMIS needs to handle that kind of situation. Establish well-defined automated processes between high management levels of the organization and the PMIS internal settings, promising new relationship features in the way on which these two entities communicate between them [138].…”
Section: Concerns On Recommend Practitioners Needmentioning
confidence: 99%
“…As a result, R can be obtained from the above equation and placed in (27) during the update process. This is the way that risk analysis is performed in the proposed performance evaluation model.…”
Section: The Basic Notation Of the Kf Forecasting Modelmentioning
confidence: 99%
“…A new formula to calculate the (EAC) is presented [15], i.e., Estimate At Completion, of projects to hone EVMS. Their new method contains a formula which is composed of four variables: SPI, Scheduled Percent Complete by Duration (SPCD), Actual Percent Complete by Duration (APCD), and Sum of Durations to Due Time (SDDT).…”
Section: Evmmentioning
confidence: 99%
“…The other important aspect is that, unlike other methods, the SSA does not need any statistical assumptions, such as the stationarity of the series or the normality of the residuals. The basic concepts of the project progress generator have been shown by Iranmanesh and Tavassoli [15]. In this paper, the well-developed model with more details is presented.…”
Section: Project Progress Generator Frameworkmentioning
confidence: 99%
See 1 more Smart Citation