2017
DOI: 10.1007/978-3-319-64465-3_6
|View full text |Cite
|
Sign up to set email alerts
|

Intelligent Systems of Forecasting the Failure of Machinery Park and Supporting Fulfilment of Orders of Spare Parts

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
16
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
6
2

Relationship

1
7

Authors

Journals

citations
Cited by 34 publications
(16 citation statements)
references
References 10 publications
0
16
0
Order By: Relevance
“…temperature, vibration and noise, marked in the figure as observation vectors) are supplied to the intelligent system for prediction method selection. On their basis, drawing upon the IT and prediction criteria indications (by the ranking method), the system will select a suitable mathematical model:  for stationary series [7,19]:…”
Section: Principlesmentioning
confidence: 99%
See 1 more Smart Citation
“…temperature, vibration and noise, marked in the figure as observation vectors) are supplied to the intelligent system for prediction method selection. On their basis, drawing upon the IT and prediction criteria indications (by the ranking method), the system will select a suitable mathematical model:  for stationary series [7,19]:…”
Section: Principlesmentioning
confidence: 99%
“…2 Diagram of the prediction and decision-making algorithm in a maintenance service support system [9].  for non-stationary series [1,7,20]: autoregressive integrated moving average (ARIMA), seasonal ARIMA (SARIMA), -Autoregressive Conditional Heteroscedasticity (ARCH), -Generalized ARCH (GARCH), -Randomized GARCH (RGARCH), -Exponential GARCH (EGARCH), -Threshold ARCH (TARCH), -Heterogeneous interval ARCH (HARCH). The reason for selecting a mathematical model in real time is to obtain the most accurate prediction for a given time window.…”
Section: Principlesmentioning
confidence: 99%
“…The electrical tomography is a technique of imaging the distribution of conductivity or permittivity inside the tested object from measurements of the distribution of potentials on the object surface. Many different techniques can be used for the optimization process [10,12,16,24,25]. Figure 2 shows surface electrodes, while the wall with measurement system is presented in Fig.…”
Section: Measurement Systemmentioning
confidence: 99%
“…At present, a significant trend can be watched for the robotization of modern procedures, which is firmly identified with process control. The need to automate the control of innovative procedures is one of the fundamental purposes behind the dynamic improvement of IT information handling strategies [3], [4]. Simulation and experimental tests are an important condition for optimizing the control of processes carried out by liquid and suspension mixing systems that under certain circumstances can crystallize [5].…”
Section: Introductionmentioning
confidence: 99%