Intelligent Well Completion in the Kitan Oil Field

Abstract: The first hydraulically operated completion was installed in Australia in 2004 (Guatelli et al 2004). Since then, a number of intelligent completions have been installed in offshore Australia. The remoteness of offshore Australia, particularly in the Timor Sea area, means intervention vessels are not readily available and well interventions are costly operations. For this reason, intelligent completion is considered to be an attractive alternative, by providing a down-hole solution to actively manage the reser… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2013
2013
2013
2013

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 6 publications
0
1
0
Order By: Relevance
“…An intelligent completion design was adopted to efficiently produce two different production zones. The intelligent completion design consists of two multistage hydraulic down-hole flow control valves (FCVs) and three DHGs to independently control and monitor two different production zones (Yokote, et al, 2012). Production from the Kitan field started in 2011.…”
Section: Blacktip Gas Projectmentioning
confidence: 99%
“…An intelligent completion design was adopted to efficiently produce two different production zones. The intelligent completion design consists of two multistage hydraulic down-hole flow control valves (FCVs) and three DHGs to independently control and monitor two different production zones (Yokote, et al, 2012). Production from the Kitan field started in 2011.…”
Section: Blacktip Gas Projectmentioning
confidence: 99%