Abstract:It is shown that the fourth converter unit with a capacity of 350 MW commissioned in 2000 at the Vyborg back-to-back direct-current converter station connecting the power systems of Russia and Finland increased the total installed power of the converter units to 1400 MW. The circuitry of the converter station and its connections permits two independent transmissions through the Vyborg substation with mutual redundancy and with allowance for the requirements of the receiving power system with respect to the max… Show more
Set email alert for when this publication receives citations?
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.