Intensification of 330/400 kv power transmission in the back-to-back project connecting russia and finland

Abstract: It is shown that the fourth converter unit with a capacity of 350 MW commissioned in 2000 at the Vyborg back-to-back direct-current converter station connecting the power systems of Russia and Finland increased the total installed power of the converter units to 1400 MW. The circuitry of the converter station and its connections permits two independent transmissions through the Vyborg substation with mutual redundancy and with allowance for the requirements of the receiving power system with respect to the max… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 1 publication
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?