2021
DOI: 10.1016/j.jmsy.2021.05.014
|View full text |Cite
|
Sign up to set email alerts
|

Interference probability matrix for disassembly sequence planning under uncertain interference

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
6
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 13 publications
(6 citation statements)
references
References 47 publications
0
6
0
Order By: Relevance
“…Compared to complete disassembly, the goal of selective disassembly is to obtain specific details (such as high value, features that require repair, etc.) or immediately stop after achieving particular objectives (such as maximum profit) [7,8,9]. Suppose the complete disassembly sequence is similar to the reverse process of the assembly sequence, i.e., the reverse assembly sequence.…”
Section: Selective Disassemblymentioning
confidence: 99%
“…Compared to complete disassembly, the goal of selective disassembly is to obtain specific details (such as high value, features that require repair, etc.) or immediately stop after achieving particular objectives (such as maximum profit) [7,8,9]. Suppose the complete disassembly sequence is similar to the reverse process of the assembly sequence, i.e., the reverse assembly sequence.…”
Section: Selective Disassemblymentioning
confidence: 99%
“…In addition, in order to improve the recommendation efficiency of the algorithm, the batch processing module [18] is added. For 90000 training data in the experiment, it is divided into 9 batches and 10000 data are processed each time, which greatly reduces the amount of calculation of model training and the instability of model convergence caused by the calculation of each training data.…”
Section: Plos Onementioning
confidence: 99%
“…In Eq (17), μ represents the error correction coefficient. Meanwhile, improved Eq (11) is Eq (18) to calculate Perr. The values of parameters ξ 1 and ξ 2 can be obtained from cross validation experiments.…”
Section: Plos Onementioning
confidence: 99%
“…The disassembly precedence between parts is represented as the disassembly priority graph owing to Han et al (2013) and Tseng et al (2019). Laili et al (2021) used the interference probability matrix to represent the disassembly interference between parts. The uncertainty of the interference condition is noted as a probability.…”
Section: Introductionmentioning
confidence: 99%
“…Disassembly is a significant step in product remanufacturing and recycling (Zhou et al , 2019). Disassembly sequence planning (DSP) is to find the optimal disassembly sequence of parts, which is one key technology for product remanufacturing (Laili et al , 2021). A good disassembly sequence is helpful to reduce the disassembly cost and improve the disassembly efficiency.…”
Section: Introductionmentioning
confidence: 99%