2020
DOI: 10.1016/j.compchemeng.2020.106773
|View full text |Cite
|
Sign up to set email alerts
|

Introducing approximate well dynamics into production optimization for operations scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
3
1
1

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 29 publications
0
3
0
Order By: Relevance
“…With faster dynamics, and commonly facing platform equipment issues, operating setpoints in the subsea side up to the topside facilities are remote. Hülse et al (2020) developed a short-term scheduling model, e.g., as per 16 hours, for well operations coping with uncertainties in the threephase vessel, while determining decision-making for variables related to flow conservation and pressure balances for global variables within a platform as gas-lift compressors and valves. In their work, the wells are operated with gas-lift, and material utilities along the platform are not accounted for.…”
Section: State Of the Art And Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…With faster dynamics, and commonly facing platform equipment issues, operating setpoints in the subsea side up to the topside facilities are remote. Hülse et al (2020) developed a short-term scheduling model, e.g., as per 16 hours, for well operations coping with uncertainties in the threephase vessel, while determining decision-making for variables related to flow conservation and pressure balances for global variables within a platform as gas-lift compressors and valves. In their work, the wells are operated with gas-lift, and material utilities along the platform are not accounted for.…”
Section: State Of the Art And Reviewmentioning
confidence: 99%
“…Another drawback of simulators is that they are not made to perform degenerative functions for uncertainties like composition and subsea production capacity, which clearly decline with time for oil and gas, while increase for water. Since oil wells cannot produce uninterruptedly during all field development phases, due to operational issues (Hülse et al, 2020), a scheduling model that can input uncertainty is prone to provide solution for this case. Similarly, for dynamic modeling and simulation for part of a topside facility using CAPE-OPEN softwares, see Trica (2022) for blackoil modeling approach with interconnected oil and gas units.…”
Section: State Of the Art And Reviewmentioning
confidence: 99%
“…A chief hurdle to integrating dynamics into short-term production optimization include the computational difficulty of solving large nonlinear problems involving discrete decisions, the scales of time that can vary from seconds to hours, and the complexity of keeping models updated. Acknowledging these challenges, [15] proposed proxy models of well dynamics in the context of shut-in and start-up operations for well over a planning horizon, which are needed in the event of compressor failure and later recovery. Despite the use of proxy dynamic models, the identification, synthesis and maintenance of proxy well dynamic models was deemed costly for practical application by production engineers of the Brazilian Oil Company (Petrobras).…”
Section: Introductionmentioning
confidence: 99%