2015
DOI: 10.1061/(asce)co.1943-7862.0000982
|View full text |Cite
|
Sign up to set email alerts
|

Investigating the Role of Lean Practices in Enabling BIM Adoption: Evidence from Two Indian Cases

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
75
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
4
3
3

Relationship

1
9

Authors

Journals

citations
Cited by 86 publications
(85 citation statements)
references
References 38 publications
1
75
0
Order By: Relevance
“…BIM has been portrayed as a 'change agent' with benefits including added value to clients (McGraw Hill Construction, 2014b); increased quality of communication and information flow (Mahalingam, Yadav, & Varaprasad, 2015;Sacks, Koskela, Dave, & Owen, 2010); enhanced visualization (Forgues, Staub-french, Tahrani, & Poirier, 2014); design error reduction (Love, Edwards, Han, & Goh, 2011); collaboration in design and construction (Sacks et al, 2010); reduction in variation and cycle times (Ahuja, Sawhney, & Arif, 2014); improved design coordination (Hooper & Ekholm, 2010) and accurate quantity estimation (Sabol, 2008). The McGraw Hill Construction (2014a) states that BIM helps to reduce rework and clashes, improve productivity and reduce overall project duration.…”
Section: Literature Reviewmentioning
confidence: 99%
“…BIM has been portrayed as a 'change agent' with benefits including added value to clients (McGraw Hill Construction, 2014b); increased quality of communication and information flow (Mahalingam, Yadav, & Varaprasad, 2015;Sacks, Koskela, Dave, & Owen, 2010); enhanced visualization (Forgues, Staub-french, Tahrani, & Poirier, 2014); design error reduction (Love, Edwards, Han, & Goh, 2011); collaboration in design and construction (Sacks et al, 2010); reduction in variation and cycle times (Ahuja, Sawhney, & Arif, 2014); improved design coordination (Hooper & Ekholm, 2010) and accurate quantity estimation (Sabol, 2008). The McGraw Hill Construction (2014a) states that BIM helps to reduce rework and clashes, improve productivity and reduce overall project duration.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Specifically, we chose to use a technology called BIM (Building Information Modelling) that is relatively well known in the Architecture-Engineering-Construction (AEC) industry, to build our prototypes. BIM is a digital platform through which project teams in the AEC industry can build parametric models of the built environment, share information better, visualize project processes and take decisions that can improve project performance (Teicholz, 2004;Construction Users Roundtable (CURT), 2005;Mahalingam et al, 2015). While enhanced coordination during design and construction is touted as one of the key benefits of using the BIM platform (Azhar, 2011), one of the most common uses of BIM currently in the AEC industry is to visualize 3-Dimensional models of buildings and The parametric nature of the BIM platform also allows users to interact with the 3D model, quickly change parameters and develop walk-throughs and videos that can enhance the experience of viewing the model.…”
Section: Methodsmentioning
confidence: 99%
“…[ 16,35,40,41,43,46,48,[52][53][54][55][56][57][58] PC 6 The coordination of project information between the different stakeholders is performed through a single platform, which allows systematic updates and continuous communication between stakeholders. [14,24,35,36,40,54,56,58,59] During the design phase, there are many iterations associated with both the creative process of design and the existence of problems of a different nature, such as incompatibilities between specialties, regulatory constraints, economic constraints, and ill-defined requirements, among others [34]. Therefore, these creative or problem iterations will generate instances of decision making and problem solving (category 3), which can be addressed individually and centralized, collaboratively and decentralized [60], or intuitively with defined and standardized action protocols [23,61].…”
Section: Of 19mentioning
confidence: 99%