2022
DOI: 10.1061/(asce)me.1943-5479.0000987
|View full text |Cite
|
Sign up to set email alerts
|

Investigation and Improvements of the Existing Best-Value Selection Criteria for Elevator Maintenance Contractors

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
3
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 41 publications
0
3
0
Order By: Relevance
“…Hadidi and Khater [20] concluded that maintenance contractors should be procured based on their past performance, expertise, technical plans, and health and safety plans. Zubair and Zhang [21] developed a framework for elevator maintenance contractors through text analysis of RFPs. This study focused on improving the current practices for maintenance contractor selection through content analysis of existing RFPs.…”
Section: Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…Hadidi and Khater [20] concluded that maintenance contractors should be procured based on their past performance, expertise, technical plans, and health and safety plans. Zubair and Zhang [21] developed a framework for elevator maintenance contractors through text analysis of RFPs. This study focused on improving the current practices for maintenance contractor selection through content analysis of existing RFPs.…”
Section: Literature Reviewmentioning
confidence: 99%
“…These studies recommend using non-price criteria, such as past performance and experience, in contractor selection instead of low-priced traditional selection. Similarly, many other studies on the maintenance contractor selection process have been carried out by Zavadskas and Vilutien ė [11], Zavadskas et al [19], Hadidi and Khater [20], and Zubair and Zhang [21], which also focus on the use of non-price factors.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation