2021
DOI: 10.1155/2021/9994477
|View full text |Cite
|
Sign up to set email alerts
|

Investigation on Dewatering of a Deep Shaft in Strong Permeable Sandy Pebble Strata on the Bank of the Yellow River

Abstract: This paper reports the dewatering scheme of a deep excavation in sandy pebble strata. The excavation is in high permeability strata and is close to the Yellow River, making the dewatering difficult during construction. At present, few researchers have specially studied the dewatering scheme of deep excavations in strong permeable strata near the water resource. Field pumping test was conducted before the excavation activity, and the permeability coefficient of the strata was obtained by reverse analysis. Accor… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 27 publications
0
0
0
Order By: Relevance