2021 International Conference in Advances in Power, Signal, and Information Technology (APSIT) 2021
DOI: 10.1109/apsit52773.2021.9641203
|View full text |Cite
|
Sign up to set email alerts
|

Investigations of Capacity Expansion Planning Using LEAP Model

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…The cumulative installed capacity of the Indian state of Assam was 1832.8 MW. Coal and gas plants contributed 41% and 36%, respectively, to the total capacity, while hydro and Renewable Energy (RE) sources contributed 19% and 4%, respectively [4]. Rural electrification, particularly in states such as Assam where approximately 70% of the population lives in rural areas, is a critical requirement.…”
Section: Introductionmentioning
confidence: 99%
“…The cumulative installed capacity of the Indian state of Assam was 1832.8 MW. Coal and gas plants contributed 41% and 36%, respectively, to the total capacity, while hydro and Renewable Energy (RE) sources contributed 19% and 4%, respectively [4]. Rural electrification, particularly in states such as Assam where approximately 70% of the population lives in rural areas, is a critical requirement.…”
Section: Introductionmentioning
confidence: 99%