Elektrische Energieversorgung 2010
DOI: 10.1007/978-3-8348-9761-9_13
|View full text |Cite
|
Sign up to set email alerts
|

Investitionsrechnung und Wirtschaftlichkeitsberechnung für elektrische Anlagen

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…The goal of companies usually is to generate as much profit as possible at low cost [29]. From a business management point of view, it is important to cover both the company's energy requirements and to achieve this at the lowest possible cost [30].…”
Section: Economic Evaluationmentioning
confidence: 99%
“…The goal of companies usually is to generate as much profit as possible at low cost [29]. From a business management point of view, it is important to cover both the company's energy requirements and to achieve this at the lowest possible cost [30].…”
Section: Economic Evaluationmentioning
confidence: 99%
“…For the calculation of the annual costs, the useful lifespan of the lines still has to be determined. For underground cables, a lifespan of 40 years is generally assumed [22], and the normal operating life in accordance with the electricity grid charge ordinance is also 40 years [23].…”
Section: Grid Reinforcement Costsmentioning
confidence: 99%
“…It is assumed that each MV distribution grid is connected to the HV level via transformers at only one substation. This assumption reflects the status quo in Germany and implies that during normal (n-0) operation, tie points between neighboring MV grids are operated as open switches [3,[61][62][63]. Possible changes of the HV feeding situation by closing normally open tie switches are not considered.…”
Section: Data Modelmentioning
confidence: 99%