SPE Middle East Oil &Amp; Gas Show and Conference 2017
DOI: 10.2118/183853-ms
|View full text |Cite
|
Sign up to set email alerts
|

Issues of Material Compatibility in Artificial Lift Completions: Case Study of Harsh Water Wells

Abstract: Material compatibility is key to proper equipment design, operation and reliability in both well and artificial lift completion. This paper addresses material compatibility lessons learned from well completion components exposed to harsh hydrocarbon and saline subsurface environments. Dismantle Inspection Failure Analysis (DIFA) was utilized to ascertain the failure root cause for 25 water source wells utilizing Electrical Submersible Pumps (ESPs). Positive Material Identification (PMI) testing … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…The cable insulation is usually composed of multiple layers. These could include several materials based on the predicted downhole conditions (Kalu-Ulu et al 2017;Lucas et al 2018;Saveth 2014;Jinjiang et al 2020). The most common materials used to insulate the electric cable are as follows:…”
Section: Cable Failurementioning
confidence: 99%
“…The cable insulation is usually composed of multiple layers. These could include several materials based on the predicted downhole conditions (Kalu-Ulu et al 2017;Lucas et al 2018;Saveth 2014;Jinjiang et al 2020). The most common materials used to insulate the electric cable are as follows:…”
Section: Cable Failurementioning
confidence: 99%