2021
DOI: 10.1016/j.cie.2021.107491
|View full text |Cite
|
Sign up to set email alerts
|

Joint optimisation on maintenance policy and resources for multi-unit parallel production system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 10 publications
(1 citation statement)
references
References 33 publications
0
1
0
Order By: Relevance
“…Panagiotidou [12] also proposed optimizing preventive replacements and spare parts orders through an integrated model, but in this case, the model was applied to a parallel production system with more than one identical component. Gao et al [13] developed a multi-unit parallel continuous production system with multiple repairmen and spare parts. An optimal displacement sequence for spare units is determined using a genetic algorithm.…”
Section: Scheduling and Inventory Management For Continuitymentioning
confidence: 99%
“…Panagiotidou [12] also proposed optimizing preventive replacements and spare parts orders through an integrated model, but in this case, the model was applied to a parallel production system with more than one identical component. Gao et al [13] developed a multi-unit parallel continuous production system with multiple repairmen and spare parts. An optimal displacement sequence for spare units is determined using a genetic algorithm.…”
Section: Scheduling and Inventory Management For Continuitymentioning
confidence: 99%