2019
DOI: 10.1016/j.ijpe.2019.02.007
|View full text |Cite
|
Sign up to set email alerts
|

Joint optimization of spare parts inventory and service engineers staffing with full backlogging

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
22
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
8

Relationship

2
6

Authors

Journals

citations
Cited by 24 publications
(28 citation statements)
references
References 50 publications
0
22
0
Order By: Relevance
“…In this problem, the outside opportunity or alternative for the local service provider is switching to the full backlogging policy where the failures will be backlogged in the case the spare parts or service engineers are not immediately available. The LSP problem with full backlogging policy is studied in Rahimi-Ghahroodi et al (2018). Without loss of generality, we assume that the emergency supplier reserved profit is 0.…”
Section: Model Descriptionmentioning
confidence: 99%
See 2 more Smart Citations
“…In this problem, the outside opportunity or alternative for the local service provider is switching to the full backlogging policy where the failures will be backlogged in the case the spare parts or service engineers are not immediately available. The LSP problem with full backlogging policy is studied in Rahimi-Ghahroodi et al (2018). Without loss of generality, we assume that the emergency supplier reserved profit is 0.…”
Section: Model Descriptionmentioning
confidence: 99%
“…In Rahimi-Ghahroodi et al (2018) and Rahimi-Ghahroodi et al (2017), an integrated spare parts inventory and service engineers planning problem is studied but with different service policies. While in the first paper the backlogging policy for both spare parts and service engineers is assumed, in Rahimi-Ghahroodi et al (2017), a full emergency shipment in the case of spare parts stock out, with a cost C per emergency shipment is considered.…”
Section: B Service Policies Comparisonmentioning
confidence: 99%
See 1 more Smart Citation
“…Recent advances in PSS-related research has expanded to other important areas, such as sustainable product service system design [27,28], cloud based product service system design [29,30], product service system implementation for the smart city [31], and incorporation of digital twin concept to the product service systems [32]. Recent works on field repair kit optimization include the joint planning and optimization of spare parts inventory and service engineer staffing [33,34].…”
Section: Literature Reviewmentioning
confidence: 99%
“…In order to understand the importance of spare part inventory, authors such as Zhu et al [11] implemented forecasting techniques, whereas Rahimi et al [12] sought to determine the number of technicians necessary to save costs. Additionally, Basten and Ryan [13] compared two inventory management models based on intervals between maintenance sessions.…”
Section: Introductionmentioning
confidence: 99%