2018
DOI: 10.1007/s12524-018-0867-y
|View full text |Cite
|
Sign up to set email alerts
|

Joint Probability Integral Method and TCPInSAR for Monitoring Mining Time-Series Deformation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
8
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
9
1

Relationship

1
9

Authors

Journals

citations
Cited by 14 publications
(8 citation statements)
references
References 20 publications
0
8
0
Order By: Relevance
“…e probability integral method, based on the normal distribution function as the influence function, expresses the surface subsidence basin with the integral formula. e related formulas for calculating the movement and deformation of any point on the surface, respectively, are expressed in the following [23][24][25][26][27]:…”
Section: Maximum Deformation Value Of Any Point On the Groundmentioning
confidence: 99%
“…e probability integral method, based on the normal distribution function as the influence function, expresses the surface subsidence basin with the integral formula. e related formulas for calculating the movement and deformation of any point on the surface, respectively, are expressed in the following [23][24][25][26][27]:…”
Section: Maximum Deformation Value Of Any Point On the Groundmentioning
confidence: 99%
“…In addition, they combined the LOS observation derived by InSAR and eight geometric parameters describing the coal mining-induced goaf by using the PIM and proposed a functional relationship between them [17,18]. Zheng et al combined the deformation predicted by the PIM and temporarily coherent point SAR interferometry (TCPInSAR) to invert the deformation in low coherent mining areas [19]. Du et al discussed the location deviation of the real inflection point and proposed an improved PIM by using the back basin boundary derived by D-InSAR in the mining direction to calculate the mining depth [20].…”
Section: Introductionmentioning
confidence: 99%
“…The gypsum mine was built in the 1980s and 1990s, using the shallow hole room-pillar method, retreat mining production technology, blasting and mining, and light rail transportation. The goal of gypsum mine is unfilled [1]. There were nine ground subsidence's from 2008 to 2013.…”
Section: Introductionmentioning
confidence: 99%