2023
DOI: 10.1007/s00170-023-12688-0
|View full text |Cite
|
Sign up to set email alerts
|

Joint production, maintenance and quality control chart optimization for a degrading manufacturing–reworking system with assignable causes

Mohamed Ali Kammoun,
Zied Hajej,
Sofiene Dellagi
et al.
Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 49 publications
0
2
0
Order By: Relevance
“…According to Equations ( 21) and ( 22), among the seven orders, orders 1 and 2 are high-level orders, orders 3 and 4 are intermediate-level orders, and orders 5, 6 and 7 are basic-level orders. Among the 36 machines, machines 1, 2, 3,4,10,11,12,13,19,20,21,22,28,29,30 and 31 belong to the high-health group machine set, machines 5,6,7,14,15,16,23,24,25,32,33 and 34 belong to the medium-health group machine set, and machines 8, 9, 17, 18, 26, 27, 35 and 36 belong to the sub-health group machine set.…”
Section: Production Line Configuration and Random Cases Generation 1)...mentioning
confidence: 99%
See 1 more Smart Citation
“…According to Equations ( 21) and ( 22), among the seven orders, orders 1 and 2 are high-level orders, orders 3 and 4 are intermediate-level orders, and orders 5, 6 and 7 are basic-level orders. Among the 36 machines, machines 1, 2, 3,4,10,11,12,13,19,20,21,22,28,29,30 and 31 belong to the high-health group machine set, machines 5,6,7,14,15,16,23,24,25,32,33 and 34 belong to the medium-health group machine set, and machines 8, 9, 17, 18, 26, 27, 35 and 36 belong to the sub-health group machine set.…”
Section: Production Line Configuration and Random Cases Generation 1)...mentioning
confidence: 99%
“…They utilised the branch and bound algorithm to reduce machine maintenance costs. Motahare [11] designed a joint optimization method for maintenance, quality and buffer inventory strategies based on P control charts for the single-machine scheduling problem. They adopted periodic preventive maintenance (PM) operations to reduce the probability of machine failures.…”
Section: Introductionmentioning
confidence: 99%