As of 2018, Bandung city has approximately 28,000 Street Lighting Equipment (SLE). Government constraints in providing funds to optimize SLE lead to limited government ability to optimize SLE. However, with the opening of the tap of the private sector's involvement policy in managing SLE infrastructure, there is the potential to optimize SLE. The problem in implementing the SLE PPP project is determining a suitable PPP scheme for providing SLE in Bandung. The obstacles include investment development schemes, the SLE database, and weak coordination between stakeholders. This research uses a qualitative approach. Determining the object of the study is carried out utilizing purposeful samples. While data collection techniques by performing observation, interview, documentation tracing, and audiovisual. Test reliability and validity using triangulation techniques. The resulting research concluded that the provision of SLE in the city of Bandung is to involve business entities in designing, building, financing, operating, and maintaining SLE infrastructure assets which will later become investments of the Bandung City Government. Alternatively, in other words, the PPP scheme suitable for the provision of SLE Bandung City is to use the Design-Build-Operate-Maintain (DBOM) type using the available payment return mechanism.