2024
DOI: 10.1108/ecam-10-2023-1060
|View full text |Cite
|
Sign up to set email alerts
|

Key performance indicators for hospital planning and construction: a systematic review and meta-analysis

Wenque Liu,
Albert P.C. Chan,
Man Wai Chan
et al.

Abstract: PurposeThe successful implementation of hospital projects (HPs) tends to confront sundry challenges in the planning and construction (P&C) phases due to their complexity and particularity. Employing key performance indicators (KPIs) facilitates the monitoring of HPs to advance their successful delivery. This study aims to comprehensively investigate the KPIs for hospital planning and construction (HPC).Design/methodology/approachThe KPIs for HPC were identified through a systematic review. Then a comprehen… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 73 publications
0
2
0
Order By: Relevance
“…It contains four variables: "D1" project scale and planning; "D2" design purpose; "D3" schematic design; and "D4" outdoor issue and regional environment. Architectural performance must be set up to meet the primary role, i.e., the health of occupants and patients' recovery time, follow regulatory standards, as well as minimise the need for future renovations [45] . The results of this study emphasise the need for a structured design process supported by literature, which includes an Initial Assessment and Needs Analysis.…”
Section: Design Factorsmentioning
confidence: 99%
See 1 more Smart Citation
“…It contains four variables: "D1" project scale and planning; "D2" design purpose; "D3" schematic design; and "D4" outdoor issue and regional environment. Architectural performance must be set up to meet the primary role, i.e., the health of occupants and patients' recovery time, follow regulatory standards, as well as minimise the need for future renovations [45] . The results of this study emphasise the need for a structured design process supported by literature, which includes an Initial Assessment and Needs Analysis.…”
Section: Design Factorsmentioning
confidence: 99%
“…Technical factors in Vietnam's medical system encompass five key variables, with "T4," known for its compatibility with the medical system, "T2" operability, "T5" emissions level, "T3" integrated capability, and "T1" feasibility. The use of technological advancement is a critical concern in contemporary hospital construction to ensure adherence to intricate healthcare facility standards and facilitate the integration of medical equipment [45] . In the context of Vietnam, technology transfer and collaboration are vital.…”
Section: Technical Factorsmentioning
confidence: 99%