2012
DOI: 10.1016/j.proenv.2012.01.262
|View full text |Cite
|
Sign up to set email alerts
|

Kickoff of Offshore Wind Power in China: Playoffs for China Wind Power Development

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
3
0
1

Year Published

2012
2012
2022
2022

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(4 citation statements)
references
References 4 publications
0
3
0
1
Order By: Relevance
“…Both FIT and the FIP provide greater stability and security to ORE promoters, albeit their degree of effectiveness will depend on the limits for the amount pre‐established by the government, as well as the specific amount that results from the auction or tendering procedure (if applicable). Thus, for example, in the case of China, in the first round of offshore wind farm concession projects in 2010, promoters submitted excessively low bids to be selected and the result was the obtainment of excessively low and unprofitable FITs (He et al, 2016; Xiliang et al, 2012). The implementation of a quota system, which is generally accompanied by the sale of Tradable Green Certificates from producers to suppliers.…”
Section: Legal‐economic and Financial Support To Offshore Renewable E...mentioning
confidence: 99%
“…Both FIT and the FIP provide greater stability and security to ORE promoters, albeit their degree of effectiveness will depend on the limits for the amount pre‐established by the government, as well as the specific amount that results from the auction or tendering procedure (if applicable). Thus, for example, in the case of China, in the first round of offshore wind farm concession projects in 2010, promoters submitted excessively low bids to be selected and the result was the obtainment of excessively low and unprofitable FITs (He et al, 2016; Xiliang et al, 2012). The implementation of a quota system, which is generally accompanied by the sale of Tradable Green Certificates from producers to suppliers.…”
Section: Legal‐economic and Financial Support To Offshore Renewable E...mentioning
confidence: 99%
“…Currently, the following household kilowatt small wind power turbine has begun mass production, however, it is only a small volume of individual products among tens of kilowatts and kilowatt wind power turbines, and most products can not be produced [6] . Also, most of the enterprises are the amateur companies, rather than specializing in the production plant.…”
Section: The Issues and Gaps In Stand-alone Wind Power Generation mentioning
confidence: 99%
“…The development of wind power is fast in recent years [1,2] , so it's necessary to consider the influence of wind power at the stage of power grid planning. As the detailed model of one wind turbine is already very complex [3], the detailed model of a wind farm consisting of dozens of wind turbines is too complex to be used for the electrical calculation in wind power integration planning.…”
Section: Introductionmentioning
confidence: 99%