2022
DOI: 10.1007/s12204-022-2544-0
|View full text |Cite
|
Sign up to set email alerts
|

Knowledge-Based Curved Block Construction Scheduling and Application in Shipbuilding

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 12 publications
0
1
0
Order By: Relevance
“…As summarized in Figure 1, the process starts with profiling and plate forming for the production of pre-assemblies and small assemblies [13]. Next, the straight blocks are manufactured [14], which correspond to the master areas and superstructures, as well as the curved blocks [15], which correspond to the engine, bow and stern areas. In some cases, these blocks pass through an intermediate pre-assembly area, which includes both armament and equipment.…”
Section: Introductionmentioning
confidence: 99%
“…As summarized in Figure 1, the process starts with profiling and plate forming for the production of pre-assemblies and small assemblies [13]. Next, the straight blocks are manufactured [14], which correspond to the master areas and superstructures, as well as the curved blocks [15], which correspond to the engine, bow and stern areas. In some cases, these blocks pass through an intermediate pre-assembly area, which includes both armament and equipment.…”
Section: Introductionmentioning
confidence: 99%