Labor resource allocation under extremely short construction period based on the inverse optimization method

Abstract: PurposeThis research is aimed to mainly be applicable to expediting engineering projects, uses the method of inverse optimization and the double-layer nested genetic algorithm combined with nonlinear programming algorithm, study how to schedule the number of labor in each process at the minimum cost to achieve an extremely short construction period goal.Design/methodology/approachThe method of inverse optimization is mainly used in this study. In the first phase, establish a positive optimization model, accord… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 43 publications
0
0
0
Order By: Relevance
“…Products include the construction of bridges, buildings, ports, and roads. These construction projects are becoming increasingly complex and sophisticated, involving the use of resources in the form of human power, materials, equipment, and increasingly large amounts of funds (Peng & Liu, 2024).…”
Section: Introductionmentioning
confidence: 99%
“…Products include the construction of bridges, buildings, ports, and roads. These construction projects are becoming increasingly complex and sophisticated, involving the use of resources in the form of human power, materials, equipment, and increasingly large amounts of funds (Peng & Liu, 2024).…”
Section: Introductionmentioning
confidence: 99%