Lean management framework for improving maintenance operation: development and application in the oil and gas industry

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
30
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 44 publications
(31 citation statements)
references
References 49 publications
1
30
0
Order By: Relevance
“…There are many types of defuzzification methods, but centroid, also known as the centre of gravity, is the most widely used [45]. The centroid method is shown in Equation (9).…”
Section: Fuzzy Logic Working Principles For Criticality Assessmentmentioning
confidence: 99%
See 1 more Smart Citation
“…There are many types of defuzzification methods, but centroid, also known as the centre of gravity, is the most widely used [45]. The centroid method is shown in Equation (9).…”
Section: Fuzzy Logic Working Principles For Criticality Assessmentmentioning
confidence: 99%
“…The uniqueness of assets comprised in the bulk of activities performed during MoOSTs may lead to delays that are most evident in systems where failures are not self-revealed, especially in production critical systems, whereby running inspections are impractical [8]. Consequently, MoOSTs management is particularly burdened with overt reliance on outsourced resources, as well as constraints, such as separation of asset owners and complex accountability for asset management, which makes the measurement of asset maintenance performance and its continuous control and evaluation critical [9]. Critical issues plaguing engineering organisations are anticipated loss of specialist knowledge due to the retirement of experienced practitioners and dearth in replenishing expertise held by collective groups of individuals involved in MoOSTs [10].…”
Section: Introductionmentioning
confidence: 99%
“…Lean thinking aims to perform activities or services with fewer resources, fewer tools, less time, less physical space, high customer satisfaction, minimum non-value-added action and minimum waste [15]. In the FM, unnecessary inspection and repairs, breakdown, increase in downtime duration, rework, safety issues, high maintenance costs, efficiency and performance problems, rapid wear of components, excessive resource utilization and storage, timely decision making, transportation of materials, the unnecessary motion of staffs, variation in processes, data searching and customer dissatisfaction can be seen as application areas for LMP [4,9,12,100,101].…”
Section: Lean Management Practices In Facility Managementmentioning
confidence: 99%
“…Mostafa et al [101] proposed a lean maintenance structure that is designed based on five lean principles; specifying the value, identifying the value stream, flow the value, pulling the value and pursue perfection. Shou et al [9] proposed a lean management framework for maintenance acitivities. To verify the proposed framework, the authors used 4D BIM from a real-life environment.…”
Section: Lean Management Practices In Facility Managementmentioning
confidence: 99%
“…Meanwhile, "four-dimensional simulation before construction" (D16) exerted more influence on BIM implementation in the large construction firms (mean = 3.71) than in the SM firms (mean = 2.38). Four-dimensional simulation is another BIM engine [36] and helps the team easily understand the construction impact of any decisions [64]. The multiple roles of the large contractors meant more work processes, which necessitated better scheduling before construction.…”