Lean project planning and control: empirical investigation of ETO projects

Abstract: Purpose The purpose of this paper is to empirically investigate an effective project management practice focusing on planning and control. By doing so, it contributes to the debate on rethinking traditional project management practices and accentuates the need for adjustments based on the project context. Design/methodology/approach This paper extends the project management theory by proposing a lean project planning (LPP) and control framework, developed and tested in collaboration with ten engineer-to-orde… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
15
0
6

Year Published

2021
2021
2023
2023

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 22 publications
(21 citation statements)
references
References 78 publications
0
15
0
6
Order By: Relevance
“…PCS is a collective framework that includes the people, processes and tools used to keep projects on track and within planned scope, budget and schedule (Jayaraman, 2016; Jünge et al , 2019). The objective of PCS is to provide management and stakeholders with accurate and reliable information that can be used to make informed decisions (Jawad et al , 2018; Kumar and Bansal, 2010; Sakka et al , 2016).…”
Section: Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…PCS is a collective framework that includes the people, processes and tools used to keep projects on track and within planned scope, budget and schedule (Jayaraman, 2016; Jünge et al , 2019). The objective of PCS is to provide management and stakeholders with accurate and reliable information that can be used to make informed decisions (Jawad et al , 2018; Kumar and Bansal, 2010; Sakka et al , 2016).…”
Section: Literature Reviewmentioning
confidence: 99%
“…It includes developing quality baseline plans and establishing a basis for identifying control gaps in order to assess the achievement of project control objectives (Kumar and Bansal, 2010; Rodrigues et al , 2014). Project management literature (Joslin and Müller, 2016; Jünge et al , 2019; PMI, 2017) has defined a Work Breakdown Structure (WBS) and Cost Breakdown Structure (CBS) as the two significant structured approaches in a project plan. A WBS is a key activity that defines the hierarchical decomposition of the work to be achieved by the project delivery team.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Stream Mapping (VSM) applications and adaptations to ETO contexts have been shown by Matt (2014), Seth et al (2017) and Strandhagen et al (2018). Also, a set of lean techniques for planning and control of engineering and production activities has been introduced by empirical studies performed within ETO companies, such as visual management (Cannas et al, 2018), pull production control (Bataglin et al, 2020;Gejo García et al, 2020;Mahmood et al, 2018;Villar-Fidalgo et al, 2019), collaborative planning (Cannas et al, 2018;Dallasega et al, 2018), and lean project management applications (Cannas et al, 2018;Dallasega et al, 2018;Jünge et al, 2019). Lorenzi and Ferreira (2018) empirically demonstrated the feasibility of failure mapping using FMEA and A3 in ETO product development.…”
Section: Theme Stream 1: Supply Chain Structures Stream 2: Eto Strate...mentioning
confidence: 99%
“…Efforts were made towards improving the efficiency of EC operations conducted by ETO SMEs, as identified in the literature. Some of these efforts involve creating methods for handling EC project planning and control (Jünge et al , 2019). The consequences of using digital technologies for integrating ETO operations conducted by SMEs are scarcely addressed in the literature or not at all.…”
Section: Background Literaturementioning
confidence: 99%