Lebenszykluskostenbetrachtungen für chloridexponierte Bauteile von Brücken‐ und Tunnelbauwerken

Abstract: An Verkehrsbauwerken mit nur sehr geringem Alter sind in der Vergangenheit vermehrt Schäden aufgetreten. Ursache ist die hohe Chloridbelastung durch Streusalz/Sole aus dem Winterdienst, welche chloridinduzierte Bewehrungskorrosion hervorruft. Die Instandsetzung resultierender Schäden ist nicht zuletzt aufgrund in der Regel erforderlicher Verkehrssicherungsmaßnahmen sehr kostenintensiv. Immer öfter stellt sich die Frage, welche Maßnahmen zu ergreifen sind, um zum einen Kosten zu reduzieren und zum anderen aber … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
6
0
1

Year Published

2022
2022
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(7 citation statements)
references
References 6 publications
0
6
0
1
Order By: Relevance
“…In this study, the service life costs were considered as the total costs of the new construction and possibly necessary interventions to reach the specified service life 5 . Here, the specified service life was 100 years.…”
Section: Methodsmentioning
confidence: 99%
See 4 more Smart Citations
“…In this study, the service life costs were considered as the total costs of the new construction and possibly necessary interventions to reach the specified service life 5 . Here, the specified service life was 100 years.…”
Section: Methodsmentioning
confidence: 99%
“…For each of the studied cases, as described in Section 2.4, the costs of the interventions in the future were calculated with an interest rate capitalization ( q 1 = 1.03) and an interest rate inflation ( q 2 = 1.02). The costs were calculated with the following formula, obtained from Reference 5: Kgoodbreak=KEgoodbreak+i=1n()()Ktgoodbreak+KVgoodbreak×q1tgoodbreak×q2t with costs of new construction K E , costs of intervention K t at time t , and costs of traffic interruption and construction site installation K V . For simplification K V was assumed as a global percentage of the costs of intervention.…”
Section: Methodsmentioning
confidence: 99%
See 3 more Smart Citations