2021
DOI: 10.1061/(asce)co.1943-7862.0002110
|View full text |Cite
|
Sign up to set email alerts
|

Legal Risk Assessment Framework for International PPP Projects Based on Metanetwork

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
16
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 17 publications
(16 citation statements)
references
References 49 publications
0
16
0
Order By: Relevance
“…Pestov (2009) believes that social, organizational, or any other realistic system can be modeled using the MNA approach (Pestov, 2009). In recent years, MNA has been applied in various research areas such as knowledge-intensive system modeling, construction project risk identification, and project organizational vulnerability assessment (Nagurney and Dong, 2005, Zhang et al, 2021, Zhu and Mostafavi, 2018. This suggests that MNA can provide a multi-dimensional perspective, structured complex interaction model to measure and diagnose the performance of project goals and tasks, which is consistent with the requirement to measure the performance of port logistics data governance (Wang et al, 2021).…”
Section: Methodsmentioning
confidence: 77%
“…Pestov (2009) believes that social, organizational, or any other realistic system can be modeled using the MNA approach (Pestov, 2009). In recent years, MNA has been applied in various research areas such as knowledge-intensive system modeling, construction project risk identification, and project organizational vulnerability assessment (Nagurney and Dong, 2005, Zhang et al, 2021, Zhu and Mostafavi, 2018. This suggests that MNA can provide a multi-dimensional perspective, structured complex interaction model to measure and diagnose the performance of project goals and tasks, which is consistent with the requirement to measure the performance of port logistics data governance (Wang et al, 2021).…”
Section: Methodsmentioning
confidence: 77%
“…First, there has been very limited comprehensive studies on the combination of PPP project risk evaluation, allocation and benefit distribution, although there have been many researches on the risk evaluation and benefit distribution. Most of the existing PPP project risk assessment models were built by combining theories and methods to allocate the risk between the government and social capital (Bengesi, 2016;Owusu-Manu et al, 2020;Zhang et al, 2021). The effect of PPP special-purpose-vehicle (SPV) is important during the whole process of PPP project startup, implementation, control and operation.…”
Section: Benefit Distribution Of Ppp Projectmentioning
confidence: 99%
“…Most of the existing PPP project risk assessment models were built by combining theories and methods to allocate the risk between the government and social capital (Bengesi, 2016; Owusu-Manu et al. , 2020; Zhang et al. , 2021).…”
Section: Literature Reviewmentioning
confidence: 99%
“…It can also analyse complex interactions between factors (Wang et al. , 2018b; Zhang et al. , 2021) and the interaction of factors is studied by changing network elements (i.e.…”
Section: Literature Reviewmentioning
confidence: 99%