Krankenhausplanung Für Wettbewerbssysteme 2000
DOI: 10.1007/978-3-642-59648-3_13
|View full text |Cite
|
Sign up to set email alerts
|

Leistungsmodule: Basis-, Schwerpunkt- und Spezialleistungen

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2014
2014
2014
2014

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…As described in [27] switching losses in the power diode are due to reverse recovery current which occurs when a transistor is turned on with a non-zero current flowing through it. Therefore, turn-off power losses in the diodes can be calculated as,…”
Section: Tablementioning
confidence: 99%
“…As described in [27] switching losses in the power diode are due to reverse recovery current which occurs when a transistor is turned on with a non-zero current flowing through it. Therefore, turn-off power losses in the diodes can be calculated as,…”
Section: Tablementioning
confidence: 99%